Water Boiler Object Bim
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Packaged boiler plant for Bristol's Bush Residential Resource Centre refurbishment Download your Building Information Modeling (BIM) object(s) for this product. Sirius Three WH 50kW 60kWGet Price
Residential Furnaces, Boilers and Baseboard Heat. Residential Electric Furnaces; Residential Gas Furnaces; Residential Oil Furnaces; Residential Boilers; Residential Baseboard Heat; Residential Coils. Residential Cased Coils; Residential Uncased Coils; Residential Packaged Units. Residential Heat Pump Packaged Units; Residential Air Conditioner Get Price
As discussed above, Level of definition can be applied at the object level (e.g. a boiler, a valve, a fan coil unit etc.) or at the system level (e.g. a heating system, a chilled water system etc.). Both definitions are equally important. The minimum system LOD (Level of Definition) should be determined (or agreed) for each work stage.Get Price
Dec 24, 2021 · I attached a boiler to the Revit project file with just one system currently defined and am sharing this file with you. Edit: I altered the system, so that the boiler is now plumbed in series. I also changed all the connectors' types to global, except for the boiler, where I set the pipe out to Hydronic Supply and the pipe in to Hydronic Return.Get Price
Packaged boiler plant for Bristol's Bush Residential Resource Centre refurbishment Download your Building Information Modeling (BIM) object(s) for this product. Sirius Three WH 50kW 60kWGet Price
As discussed above, Level of definition can be applied at the object level (e.g. a boiler, a valve, a fan coil unit etc.) or at the system level (e.g. a heating system, a chilled water system etc.). Both definitions are equally important. The minimum system LOD (Level of Definition) should be determined (or agreed) for each work stage.Get Price
Dec 24, 2021 · I attached a boiler to the Revit project file with just one system currently defined and am sharing this file with you. Edit: I altered the system, so that the boiler is now plumbed in series. I also changed all the connectors' types to global, except for the boiler, where I set the pipe out to Hydronic Supply and the pipe in to Hydronic Return.Get Price