Palm Fiber Steam Boilers

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :Palm Fiber Steam Boilers
  • Supply Capacity : 10 units/month :Palm Fiber Steam Boilers
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Combustion Evaluation: Sources and Control Devices

    In high pressure boilers, particularly when the steam is superheated, the temperature of the flue gas is still high when it leaves the last bank of •steam generating or superheating tubes. It is usually economical to build additional heat absorbing surfaces to take out some of this heat by using: (1) economizers to heat up boiler feed water Get Price

  • Dubai Electricity & Water Authority (DEWA) | Tender

    replacement of main steam flow orifices for hrsg's & auxiliary boilers, replacement of de-superheaters for hrsg's and replacement of hp/lp-1 & 2 pcv outlet pipes at 'l' station phase-1, jebel ali. selected tender. 09-sep-2021: 13-oct-2021: 66 2422100113: purchase of backhoe loader heavy duty. open tender. 16-sep-2021: 12-oct-2021Get Price

  • Chapter 2: Definitions, Ohio Building Code 2017 | UpCodes

    A room primarily utilized for the installation of fuel-burning space-heating and water-heating appliances other than boilers. GABLE . The triangular portion of a wall beneath the end of a dual-slope, pitched, or mono-slope roof or portion thereof and above the top plates of the story or level of the ceiling below.Get Price

  • WAC 296-200A-016

    :(4) "Boiler, steam fitting, process piping"— A contractor in this specialty installs, services and repairs power boiler installations and hot water heating systems, including fire-tube and water-tube steel power boilers and hot water heating low pressure boilers, steam fitting and piping, fittings, valves, gauges, pumps, radiators, convectors, hydraulics, fuel oil tanks and fuel oil lines.Get Price

  • Combustion Evaluation: Sources and Control Devices

    In high pressure boilers, particularly when the steam is superheated, the temperature of the flue gas is still high when it leaves the last bank of •steam generating or superheating tubes. It is usually economical to build additional heat absorbing surfaces to take out some of this heat by using: (1) economizers to heat up boiler feed water Get Price

  • Combustion Evaluation: Sources and Control Devices

    In high pressure boilers, particularly when the steam is superheated, the temperature of the flue gas is still high when it leaves the last bank of •steam generating or superheating tubes. It is usually economical to build additional heat absorbing surfaces to take out some of this heat by using: (1) economizers to heat up boiler feed water Get Price

  • Report Format For Valuation - Practising Valuers

    Revotherm Boiler Horizontal with water softner ID No. : 10618. 278. Water Chiller plant – 2 Chillers, Starter, Piping etc.Get Price

  • Combustion Evaluation: Sources and Control Devices

    In high pressure boilers, particularly when the steam is superheated, the temperature of the flue gas is still high when it leaves the last bank of •steam generating or superheating tubes. It is usually economical to build additional heat absorbing surfaces to take out some of this heat by using: (1) economizers to heat up boiler feed water Get Price

  • Dubai Electricity & Water Authority (DEWA) | Tender

    replacement of main steam flow orifices for hrsg's & auxiliary boilers, replacement of de-superheaters for hrsg's and replacement of hp/lp-1 & 2 pcv outlet pipes at 'l' station phase-1, jebel ali. selected tender. 09-sep-2021: 13-oct-2021: 66 2422100113: purchase of backhoe loader heavy duty. open tender. 16-sep-2021: 12-oct-2021Get Price

Discount
7X24 Online